T-300
Tracked UGV · Land

T-300

One base. Swap the deck, swap the mission. Logistics first, then casualty evacuation.

Explore
300kgPayload
12–15km/hCruise / top
~40kmRange
LFPHot-swap battery
~12kmHD link + BLOS
1.6×1.0mFootprint
Build-up

Inside
the T-300.

01 · CFG-00

The base

Tracks, drive, hot-swap batteries, control link and safety chain. The part that stays.

02 · Running gear

Under the guards

Road wheels, drive sprocket and tracks. Built to be serviced in the field.

03 · CFG-01

Carry the load

Mesh cage for ammunition, water and batteries. The load moves forward. The soldier does not carry it.

04 · CFG-02

Bring them back

Stretcher on quick mounts. A wounded soldier off the last stretch without a crewed vehicle.

T-300 base
Blueprint
T-300 running gear
Blueprint
T-300 Logistics
Blueprint
T-300 CASEVAC
Blueprint
Drawings

The partthat stays.

T-300 side elevation
A — Side · 1600 mm
T-300 plan
B — Plan · 1000 mm
T-300 rear view
T-300 side view
Service